Files
simple-aircraft-manager-rails/docs/guide/inspections.md
T
rickyandClaude Opus 5.5 31ac991bab Overview shows coming due and the last flight; intervals in days, months or years
- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the
  most recent day's legs, meters at the end, fuel and oil left).
- Component replace / TBO / inspect intervals, inspection types and ADs take
  a number and a days / months / years choice (CalendarInterval). Components
  gain month columns (years stored as 12 months; months land on the same
  date); inspection types and ADs keep end-of-month. ADs now honour days.
- Due list: hours already run out count as overdue; a component covered by
  an inspection type no longer gets its own "Inspect every" item.
- Loading calculator moved to a partial; no limit warnings until a load is
  entered. Header buttons don't wrap on phones.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-11 21:40:14 -05:00

1.2 KiB

Inspections

The Inspections tab shows each required inspection, when it was last done and when it's next due.

Setting up

Standard inspections adds the recurring inspections and checks Part 91 calls for (annual, 100-hour, pitot-static and altimeter, transponder, ELT…). Pick the ones that apply to how the aircraft is flown; each comes with its interval and what being overdue means, and you can change them afterwards.

+ Inspection Type adds your own, for example a recurring inspection from an STC's instructions for continued airworthiness. Each type has:

  • Recurring every so many hours and/or days, months or years (months and years are calendar months, due at the end of the month).
  • What overdue means: grounds the aircraft, no IFR flight (91.411), transponder can't be used (91.413), or advisory only.
  • Overrun allowance: for the 100-hour, 10 hours. Done late within it, the next one counts from when it was due (91.409(b)).
  • Also counts as: an annual also counts as the 100-hour.

Recording an inspection

Record next to an inspection logs the date and hours it was done, optionally linking the logbook entry. The logbook entry is the signed record (14 CFR 43.11); write it too.