Files
simple-aircraft-manager-rails/docs/guide/components.md
T
rickyandClaude Opus 5.5 fe3fba1736 User guide in docs/guide, shown in the app under Help
- 16 Markdown pages covering every area for pilots, owners, mechanics
  and admins, readable on GitHub
- /help renders them with a page list; links between pages work in both
  places; only listed pages can be opened
- The electronic records instructions (AC 120-78B user instructions) are
  now the guide's records page, also used as the procedures appendix
- Help link in the main menu

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 13:40:09 -05:00

26 lines
1.7 KiB
Markdown

# Components
The **Components** tab is a tree of the aircraft's parts: engine, propeller, magnetos, filters, ELT battery and so on, each with its own time and limits. Owners manage it.
## Adding a component
**+ Add Component**, or **+ Sub-component** on a component's page to put one under it (an oil filter under the engine, say). For each:
- **Type** (pick one, or type a new one), manufacturer, model, serial number, install location and status.
- **Time**: date in service, total time, last overhaul or service, hours since, and for engines and propellers the overhaul kind (printed in logbook entries as SMOH, SFOH or SNEW).
- **Limits**:
- **Replace every** hours and/or days; **Replacement critical** makes overdue replacement ground the aircraft (oil, filters, ELT battery…).
- **Expires on**: a date marked on the part, such as an ELT battery's.
- **TBO** hours and/or days. Under Part 91 TBO is usually a recommendation; tick **Treat TBO as a hard limit** only when an AD or the airworthiness limitations make it one, or **On condition** to show it without warnings.
- **Inspect every** hours and/or days, optionally critical.
Logged hours are added to every component that's in service.
## Service and replacement
On a component's page, **Service / Replace → Record Service** resets hours since overhaul or service to 0 and sets the service date to today, for example after an oil change. Tick *Part was physically replaced* to reset its total time and in-service date too.
Record the work in the [logbook](logbook.md) as well: the component reset tracks time, the logbook entry is the record.
**Show disposed** lists parts that have been removed and disposed of.