mirror of
https://github.com/rickbarrette/simple-aircraft-manager-rails.git
synced 2026-11-17 15:50:36 -05:00
- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the most recent day's legs, meters at the end, fuel and oil left). - Component replace / TBO / inspect intervals, inspection types and ADs take a number and a days / months / years choice (CalendarInterval). Components gain month columns (years stored as 12 months; months land on the same date); inspection types and ADs keep end-of-month. ADs now honour days. - Due list: hours already run out count as overdue; a component covered by an inspection type no longer gets its own "Inspect every" item. - Loading calculator moved to a partial; no limit warnings until a load is entered. Header buttons don't wrap on phones. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
19 lines
1.2 KiB
Markdown
19 lines
1.2 KiB
Markdown
# Inspections
|
|
|
|
The **Inspections** tab shows each required inspection, when it was last done and when it's next due.
|
|
|
|
## Setting up
|
|
|
|
**Standard inspections** adds the recurring inspections and checks Part 91 calls for (annual, 100-hour, pitot-static and altimeter, transponder, ELT…). Pick the ones that apply to how the aircraft is flown; each comes with its interval and what being overdue means, and you can change them afterwards.
|
|
|
|
**+ Inspection Type** adds your own, for example a recurring inspection from an STC's instructions for continued airworthiness. Each type has:
|
|
|
|
- **Recurring** every so many hours and/or days, months or years (months and years are calendar months, due at the end of the month).
|
|
- What overdue means: **grounds the aircraft**, **no IFR flight** (91.411), **transponder can't be used** (91.413), or **advisory only**.
|
|
- **Overrun allowance**: for the 100-hour, 10 hours. Done late within it, the next one counts from when it was due (91.409(b)).
|
|
- **Also counts as**: an annual also counts as the 100-hour.
|
|
|
|
## Recording an inspection
|
|
|
|
**Record** next to an inspection logs the date and hours it was done, optionally linking the logbook entry. The [logbook](logbook.md) entry is the signed record (14 CFR 43.11); write it too.
|