Files
simple-aircraft-manager-rails/docs/guide/squawks.md
T
rickyandClaude Opus 5.5 9adbc3d0a8 Docs: maintenance pages follow roles, adding aircraft
The guide pages written before roles said "owners" for work Mechanics
now do too (logbook entries, corrections, asking someone to sign,
components, resolving squawks, reminders), and the Fleet page didn't say
who can add aircraft. The index lists roles, invitations and the new
setting.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-15 19:30:29 -05:00

1.7 KiB

Squawks

A squawk is a problem found with the aircraft. Anyone on the aircraft can report one.

Report a squawk

Report Squawk asks for the issue, a priority, optionally the component, attachments (photos, PDFs) and notes.

Without signal (in the installed app: open it, tap the aircraft and Report Squawk as usual), the squawk and its photos are saved on the device and sent when the connection is back, like flights. A signal too weak to get an answer counts as none: after 10 seconds (a minute with photos) it's saved on the device instead of waiting. Sending twice never reports it twice.

A Ground Aircraft squawk notifies everyone else on the aircraft who turned on notifications.

Priority Meaning
Ground Aircraft The aircraft isn't airworthy until it's resolved.
Fix Soon Fix before it gets worse.
Fix at Next Inspection Can wait for the next inspection.
Fix Eventually Minor.

Defer an inoperative item (91.213(d))

For inoperative equipment that isn't required, Defer records the decision. You confirm each condition of 14 CFR 91.213(d): not required by the type certificate, equipment list, 91.205 or another rule, nor by an AD; removed or deactivated and placarded Inoperative; and that a pilot or mechanic has determined it isn't a hazard. You record who decided and in which role. A deferred squawk no longer grounds the aircraft. Undo deferral (owners) reverses it.

Resolve a squawk

Owners and Mechanics (the Manage squawks permission) choose Resolve. You can record the fix as a logbook entry at the same time: the date, logbook, airframe total time, work performed and who signed it off. A resolved squawk can be Reopened.