- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the
most recent day's legs, meters at the end, fuel and oil left).
- Component replace / TBO / inspect intervals, inspection types and ADs take
a number and a days / months / years choice (CalendarInterval). Components
gain month columns (years stored as 12 months; months land on the same
date); inspection types and ADs keep end-of-month. ADs now honour days.
- Due list: hours already run out count as overdue; a component covered by
an inspection type no longer gets its own "Inspect every" item.
- Loading calculator moved to a partial; no limit warnings until a load is
entered. Header buttons don't wrap on phones.
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>