Commit Graph
7 Commits
Author SHA1 Message Date
rickyandClaude Opus 5.5 31ac991bab Overview shows coming due and the last flight; intervals in days, months or years
- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the
  most recent day's legs, meters at the end, fuel and oil left).
- Component replace / TBO / inspect intervals, inspection types and ADs take
  a number and a days / months / years choice (CalendarInterval). Components
  gain month columns (years stored as 12 months; months land on the same
  date); inspection types and ADs keep end-of-month. ADs now honour days.
- Due list: hours already run out count as overdue; a component covered by
  an inspection type no longer gets its own "Inspect every" item.
- Loading calculator moved to a partial; no limit warnings until a load is
  entered. Header buttons don't wrap on phones.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-11 21:40:14 -05:00
rickyandClaude Opus 5.5 215efe6814 Consistency and accessibility: one date/time format, lang, skip link, focus outlines, alt text, labelled icons, contrast; release notes updated
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-11 21:17:26 -05:00
rickyandClaude Opus 5.5 5471b9317f Records package: intact status-report styles, no in-app controls; on-condition TSO
- Inlining CSS used String#sub with a replacement string, so "\&" in
  escaped selectors became "</head>"; use block replacements
- Packaged status report and procedures omit the Back link, the print
  button and the favicon link (they don't work outside the app)
- Status report: "On condition (Part 91)" as Tracked as, with remaining
  hours shown for reference; on condition clears the hard-limit flag

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 17:21:58 -05:00
rickyandClaude Opus 5.5 68a1719db2 Records integrity: history, nightly backup and check, records package
AC 120-78B chapter 3:
- Every change to logbook entries, sub-components, signatures, inspection
  records, AD compliance, major records, W&B, components, squawks and
  documents is kept as a RecordVersion (who, IP, when, field changes),
  hash-chained per aircraft; versions can't be edited or deleted. Shown on
  each logbook entry and in Activity -> Record history
- Nightly job: SQLite online-backup copy to storage/backups, verified
  (integrity_check + record counts), pruned to the configured number; then
  an integrity check of the history chains and every signature's seal and
  fingerprint. Results on Admin -> About ("Back up and check now"); admins
  are emailed on failure
- Software versions recorded (first/last seen) on Admin -> About
- Records package (Access & Sharing): logbook entries PDF with signatures,
  signatures.csv, record-history.csv, self-contained status report HTML,
  the .sam.zip, and a README, for the FAA/NTSB or a buyer
- Legacy (paper) records: documents can be marked as legacy records;
  aircraft have an "electronic records since" date (status report, package)

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 13:21:26 -05:00
rickyandClaude Opus 5.5 6cab81332e Unverified transcriptions, PM templates, ICA inspections, W&B, AD watch
- Entries transcribed by Claude are unverified (with Claude's confidence)
  until an owner checks them against the scan: badge, filter, "mark
  verified" stepping through the rest
- Preventive maintenance templates on new logbook entries, keyed to Part 43
  Appendix A(c), setting the entry type and pilot certificate (43.3(g))
- An STC's ICA can become a tracked recurring inspection, linked from its
  major record
- Weight & balance: history of empty weight/CG (linked to the 337 that
  changed them), loading stations and CG envelope from the POH, and a live
  calculator for takeoff and landing weight/CG; shown on the status report
- New ADs: weekly Federal Register search per aircraft (aircraft, engine
  and propeller models, or custom terms); track or dismiss each; included
  in the weekly reminder
- Archives carry the new records; brakeman: explicit params, reviewed
  About-page links

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 10:49:29 -05:00
rickyandClaude Opus 5.5 61c3749793 Deferrals, expirations, standard inspections, reminders, squawk fixes
- Squawks: defer an inoperative item under 91.213(d) once each condition
  is confirmed (pilots may too); deferred items stop grounding and are
  listed for awareness. Resolving can record the fix as a logbook entry
  (43.9 fields) or link an existing one
- Expiration dates on components (ELT battery, 91.207(c)) and documents;
  new document types (registration, airworthiness certificate, insurance,
  radio license). Expired replacement-critical parts and an expired
  registration (91.203) ground; others warn; registration warns 90 days out
- Standard inspections: one click adds annual, 100-hour, 91.411, 91.413,
  ELT (91.207(d)) and VOR (91.171) checks with the right rules, skipping
  ones already tracked and linking annual to 100-hour
- Weekly Monday reminder email to owners when something needs attention;
  profile opt-out; admin "send me this week's reminder"
- README feature table updated

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 10:24:33 -05:00
rickyandClaude Opus 5.5 a4ec7a691e Record keeping: 43.9/43.11 sign-off fields, AD method, status report
- Logbook entries record the signer's kind of certificate and number and
  an inspection's result; maintenance and inspection entries list what
  43.9 / 43.11 needs that's missing (flagged, not enforced). Transcription
  reads the certificate details too
- AD compliance records the method (inspection, terminating action, AMOC,
  not applicable) and the AD revision complied with, filled in from the AD
  when blank; the method sets the permanent / N/A flags
- Maintenance status report (91.417(a)(2)): total times, life-limited
  parts, time since overhaul, inspection and AD status, major alterations,
  open discrepancies; print or save as PDF; on maintenance share links too
- Archives carry the new fields

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-11-07 10:14:21 -05:00