mirror of
https://github.com/rickbarrette/simple-aircraft-manager-rails.git
synced 2026-11-17 15:50:36 -05:00
Electronic signatures on logbook entries (AC 120-78B chapter 2)
- Sign an entry: review exactly what's certified, choose a current certificate (eligibility checked: pilot only for preventive maintenance, inspections need their result and time), re-enter the password or sign in again with SSO (prompt=login, within 5 minutes), and confirm the "Certified by" statement (43.9 return to service, 43.11(a)(5) for inspections, preventive maintenance for pilots) - The signature stores signer, certificate, statement, UTC time, how they authenticated, IP/browser, a SHA-256 fingerprint of the entry's content and a readable snapshot; an HMAC seal covers the signature record. Status shows Valid / Superseded / Altered since signing. The signer is emailed - Signed entries (and their sub-components) can't be edited or deleted; a correction entry, once signed, supersedes the original (kept) - Owners invite an outside mechanic by email to sign one entry: one-time, 14-day link; they create or use their own account and certificate and see only that entry - Admins can disable accounts (signed out, can't sign in or sign; past signatures kept); users with signatures can't be deleted - Printouts show the electronic signature and fingerprint; archives carry signatures (marked imported, with their origin) and corrections Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
7caa213e7a
commit
d719f663bc
47 files changed
+1059
-17
No files matched your search
@@ -106,6 +106,7 @@ To back up or move a single aircraft with all its files, use **Access & Sharing
|
||||
| Inspections | Shared inspection types with hour, month, and day recurrence, plus history. Each says what overdue means (grounded, no IFR, no transponder, advisory); an annual can also count as the 100-hour, and the 100-hour's 10-hour overrun is credited (91.409(b)). One click adds the standard Part 91 set. |
|
||||
| Logbook | Maintenance entries with search and a link to a scanned document page. Records the signer's certificate kind and number and an inspection's result, and flags what 43.9 / 43.11 needs that's missing. Entries transcribed by Claude stay "unverified" until someone checks them against the scan. Entry templates (built-in pilot preventive maintenance per 43.3(g) and Part 43 Appendix A(c); admins add and edit their own under Admin → Logbook templates). Engine and propeller entries link the component and record its total time and time since overhaul (SMOH/SFOH/SNEW) at the entry, worked out from the entry's airframe total time; sub-components (an oil filter on the engine…) can be included with their own times. Print entries as a PDF on Avery 5163/5164 labels or half-letter/letter pages (boxed) to sign and put in the paper logbook. |
|
||||
| Documents | Collections, multi-file documents with a page viewer, per-document share visibility, bulk upload, and expiration dates (registration, insurance…). |
|
||||
| Electronic signatures | Logbook entries can be signed electronically along the lines of AC 120-78B chapter 2: the signer reviews the entry, picks their certificate, re-enters their password (or signs in again with SSO) and confirms a "Certified by" statement. The signature records who, which certificate, the statement, the time and a SHA-256 fingerprint of the entry, sealed by the server; the signer gets an email. Signed entries are locked: a correction is a new signed entry that supersedes the original. Owners can invite an outside mechanic to sign one entry with their own account. Disabled accounts can't sign; their past signatures stay. |
|
||||
| Major repairs and alterations | Form 337, STC, and ICA tracking; an STC's ICA can become a tracked recurring inspection. |
|
||||
| Weight & balance | History of empty weight and CG (linked to the alteration that changed them) and a loading calculator: takeoff and landing weight and CG against max gross and the CG envelope. |
|
||||
| Status report | A printable maintenance status (91.417(a)(2)): total times, life-limited parts, time since overhaul, inspections, ADs with method and revision, major alterations, open discrepancies. Also on maintenance share links. |
|
||||
|
||||
Reference in new issue
Block a user