Record keeping: 43.9/43.11 sign-off fields, AD method, status report

- Logbook entries record the signer's kind of certificate and number and
  an inspection's result; maintenance and inspection entries list what
  43.9 / 43.11 needs that's missing (flagged, not enforced). Transcription
  reads the certificate details too
- AD compliance records the method (inspection, terminating action, AMOC,
  not applicable) and the AD revision complied with, filled in from the AD
  when blank; the method sets the permanent / N/A flags
- Maintenance status report (91.417(a)(2)): total times, life-limited
  parts, time since overhaul, inspection and AD status, major alterations,
  open discrepancies; print or save as PDF; on maintenance share links too
- Archives carry the new fields

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
rickyandClaude Opus 5.5 committed 2026-11-07 10:14:21 -05:00
1 parent a4b72cf2c1
commit a4ec7a691e
30 files changed
+515 -26

No files matched your search

@@ -69,6 +69,7 @@
<td class="text-right"><%= hours(c.aircraft_hours_at_compliance) %></td>
<td><%= c.not_applicable? ? "N/A" : c.permanent? ? "Permanent" : (c.next_due_at_time.to_f > 0 ? hours(c.next_due_at_time) : "—") %></td>
<td class="max-w-md text-xs">
<div class="font-medium text-slate-700"><%= c.method_label %><%= " · #{c.ad_revision}" if c.ad_revision.present? %></div>
<%= c.compliance_notes %>
<% if c.logbook_entry || c.inspection_record %>
<div class="mt-1 flex flex-wrap gap-x-3">