Record keeping: 43.9/43.11 sign-off fields, AD method, status report

- Logbook entries record the signer's kind of certificate and number and
  an inspection's result; maintenance and inspection entries list what
  43.9 / 43.11 needs that's missing (flagged, not enforced). Transcription
  reads the certificate details too
- AD compliance records the method (inspection, terminating action, AMOC,
  not applicable) and the AD revision complied with, filled in from the AD
  when blank; the method sets the permanent / N/A flags
- Maintenance status report (91.417(a)(2)): total times, life-limited
  parts, time since overhaul, inspection and AD status, major alterations,
  open discrepancies; print or save as PDF; on maintenance share links too
- Archives carry the new fields

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
rickyandClaude Opus 5.5 committed 2026-11-07 10:14:21 -05:00
1 parent a4b72cf2c1
commit a4ec7a691e
30 files changed
+515 -26

No files matched your search

+4 -1
View File
@@ -6,7 +6,10 @@
<section class="card">
<div class="card-header">
<h2 class="card-title">Airworthiness</h2>
<%= airworthiness_badge(@airworthiness, large: true) %>
<div class="flex items-center gap-2">
<%= link_to "Status report", aircraft_report_path(@aircraft), class: "btn-secondary btn-sm", title: "Printable maintenance status (91.417)" %>
<%= airworthiness_badge(@airworthiness, large: true) %>
</div>
</div>
<div class="card-body">
<% if @airworthiness.issues.empty? %>