mirror of
https://github.com/rickbarrette/simple-aircraft-manager-rails.git
synced 2026-11-17 15:50:36 -05:00
Overview shows coming due and the last flight; intervals in days, months or years
- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the most recent day's legs, meters at the end, fuel and oil left). - Component replace / TBO / inspect intervals, inspection types and ADs take a number and a days / months / years choice (CalendarInterval). Components gain month columns (years stored as 12 months; months land on the same date); inspection types and ADs keep end-of-month. ADs now honour days. - Due list: hours already run out count as overdue; a component covered by an inspection type no longer gets its own "Inspect every" item. - Loading calculator moved to a partial; no limit warnings until a load is entered. Header buttons don't wrap on phones. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
215efe6814
commit
31ac991bab
37 files changed
+385
-75
No files matched your search
@@ -9,10 +9,10 @@ The **Components** tab is a tree of the aircraft's parts: engine, propeller, mag
|
||||
- **Type** (pick one, or type a new one), manufacturer, model, serial number, install location and status.
|
||||
- **Time**: date in service, total time, last overhaul or service, hours since, and for engines and propellers the overhaul kind (printed in logbook entries as SMOH, SFOH or SNEW).
|
||||
- **Limits**:
|
||||
- **Replace every** hours and/or days; **Replacement critical** makes overdue replacement ground the aircraft (oil, filters, ELT battery…).
|
||||
- **Replace every** hours and/or a calendar interval in days, months or years (whichever comes first); **Replacement critical** makes overdue replacement ground the aircraft (oil, filters, ELT battery…).
|
||||
- **Expires on**: a date marked on the part, such as an ELT battery's.
|
||||
- **TBO** hours and/or days. Under Part 91 TBO is usually a recommendation; tick **Treat TBO as a hard limit** only when an AD or the airworthiness limitations make it one, or **On condition** to show it without warnings.
|
||||
- **Inspect every** hours and/or days, optionally critical.
|
||||
- **TBO** hours and/or a calendar interval. Under Part 91 TBO is usually a recommendation; tick **Treat TBO as a hard limit** only when an AD or the airworthiness limitations make it one, or **On condition** to show it without warnings.
|
||||
- **Inspect every** hours and/or a calendar interval, counted from the component's last service. For an inspection with its own records (an oil change, a magneto inspection, the ELT check), set it up on the **Inspections** tab and apply it to the component instead: the inspection then governs and the component's own interval is ignored.
|
||||
|
||||
Logged hours are added to every component that's in service.
|
||||
|
||||
|
||||
Reference in new issue
Block a user