Overview shows coming due and the last flight; intervals in days, months or years
- Overview: "Coming due" (next 30 days or 10 hours) and "Last flight" (the most recent day's legs, meters at the end, fuel and oil left). - Component replace / TBO / inspect intervals, inspection types and ADs take a number and a days / months / years choice (CalendarInterval). Components gain month columns (years stored as 12 months; months land on the same date); inspection types and ADs keep end-of-month. ADs now honour days. - Due list: hours already run out count as overdue; a component covered by an inspection type no longer gets its own "Inspect every" item. - Loading calculator moved to a partial; no limit warnings until a load is entered. Header buttons don't wrap on phones. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
215efe6814
commit
31ac991bab
37 files changed
+385
-75
No files matched your search
+1
-1
@@ -4,7 +4,7 @@ The **ADs** tab lists the ADs and bulletins that apply to the aircraft or its co
|
||||
|
||||
## Adding ADs
|
||||
|
||||
- **+ New AD**: the number, type (AD, SAIB, SB, alert, other), standard or conditional, what it requires, whether it recurs (every so many hours and/or months; due at the end of the month) and a link to the AD. A conditional AD only applies when its trigger happens (“on prop strike”) and doesn't affect airworthiness. Non-mandatory bulletins can be tracked too.
|
||||
- **+ New AD**: the number, type (AD, SAIB, SB, alert, other), standard or conditional, what it requires, whether it recurs (every so many hours and/or days, months or years; months and years are due at the end of the month) and a link to the AD. A conditional AD only applies when its trigger happens (“on prop strike”) and doesn't affect airworthiness. Non-mandatory bulletins can be tracked too.
|
||||
- **Link existing**: ADs are shared between aircraft; link one already entered for another aircraft.
|
||||
- **Import from FAA DRS**: export the ADs for the aircraft, engine and propeller from the FAA's Dynamic Regulatory System, preferably as `.xlsx` so each AD keeps its DRS link, and upload it. The preview suggests **Track**, **Not applicable** or **Skip** for each AD and flags superseded ADs, model mismatches, appliance and STC-only ADs, and recurring actions. Nothing is duplicated.
|
||||
|
||||
|
||||
@@ -10,6 +10,8 @@ The **Overview** tab shows:
|
||||
|
||||
- **Airworthiness**: the overall status and each reason for it.
|
||||
- **Active squawks**, **Consumption** (oil and fuel rates), **Notes** and **Recent activity**.
|
||||
- **Coming due**: anything due in the next 30 days or 10 hours. Dates marked "~" are estimated from the last year's flying.
|
||||
- **Last flight**: the most recent day's legs as one route, the meters at the end, and the fuel and oil left.
|
||||
- **Update Hours**: enter the current meter readings (see [Flights and hours](flights.md)).
|
||||
- **Details** and the **Status report** link.
|
||||
|
||||
|
||||
@@ -9,10 +9,10 @@ The **Components** tab is a tree of the aircraft's parts: engine, propeller, mag
|
||||
- **Type** (pick one, or type a new one), manufacturer, model, serial number, install location and status.
|
||||
- **Time**: date in service, total time, last overhaul or service, hours since, and for engines and propellers the overhaul kind (printed in logbook entries as SMOH, SFOH or SNEW).
|
||||
- **Limits**:
|
||||
- **Replace every** hours and/or days; **Replacement critical** makes overdue replacement ground the aircraft (oil, filters, ELT battery…).
|
||||
- **Replace every** hours and/or a calendar interval in days, months or years (whichever comes first); **Replacement critical** makes overdue replacement ground the aircraft (oil, filters, ELT battery…).
|
||||
- **Expires on**: a date marked on the part, such as an ELT battery's.
|
||||
- **TBO** hours and/or days. Under Part 91 TBO is usually a recommendation; tick **Treat TBO as a hard limit** only when an AD or the airworthiness limitations make it one, or **On condition** to show it without warnings.
|
||||
- **Inspect every** hours and/or days, optionally critical.
|
||||
- **TBO** hours and/or a calendar interval. Under Part 91 TBO is usually a recommendation; tick **Treat TBO as a hard limit** only when an AD or the airworthiness limitations make it one, or **On condition** to show it without warnings.
|
||||
- **Inspect every** hours and/or a calendar interval, counted from the component's last service. For an inspection with its own records (an oil change, a magneto inspection, the ELT check), set it up on the **Inspections** tab and apply it to the component instead: the inspection then governs and the component's own interval is ignored.
|
||||
|
||||
Logged hours are added to every component that's in service.
|
||||
|
||||
|
||||
@@ -8,7 +8,7 @@ The **Inspections** tab shows each required inspection, when it was last done an
|
||||
|
||||
**+ Inspection Type** adds your own, for example a recurring inspection from an STC's instructions for continued airworthiness. Each type has:
|
||||
|
||||
- **Recurring** every so many hours, calendar months (due at the end of the month) and/or days.
|
||||
- **Recurring** every so many hours and/or days, months or years (months and years are calendar months, due at the end of the month).
|
||||
- What overdue means: **grounds the aircraft**, **no IFR flight** (91.411), **transponder can't be used** (91.413), or **advisory only**.
|
||||
- **Overrun allowance**: for the 100-hour, 10 hours. Done late within it, the next one counts from when it was due (91.409(b)).
|
||||
- **Also counts as**: an annual also counts as the 100-hour.
|
||||
|
||||